Chapter 162 Oregon Laws 2001
AN ACT
HB 2245
Relating to fees charged by
Board of Boiler Rules; amending ORS 480.595.
Be It Enacted by the People of the State of Oregon:
SECTION 1.
ORS 480.595 is amended to read:
480.595. (1) Upon receipt of a permit fee due on a date
determined by the Department of Consumer and Business Services, and on the same
day of each year thereafter in which an inspection is due pursuant to ORS
480.560, the Department of Consumer and Business Services may issue or renew a
permit before or after an inspection has been made pursuant to ORS 480.510 to
480.665.
(2) Permit fees shall be prescribed by the Board of Boiler
Rules with approval of the Oregon Department of Administrative Services, and
may be prorated.
(3) Maximum operating
permit fees[, including inspection fees,]
shall be determined as follows:
[(a) Boilers requiring internal inspection:
(A) No more than 50 square feet
of heating
surface............................... $ 65
(B) 51 to 500 square feet of
heating
surface................................... $ 85
(C) 501 to 1000 square feet
of heating
surface............................... $ 100
(D) More than 1000 square
feet of
heating surface........................ $ 110
(b) Boilers not requiring
internal
inspection.............................. $ 65
(c) Cast iron boilers................................. $ 65
(d) Pressure vessels: Maximum fees
based on area
of vessel,
determined by
the product of
the maximum
length and the
maximum width
or diameter:
(A) Maximum area of
50 square feet..................................... $ 55
(B) For each additional 100
square feet of
area in excess
of 50 square
feet................................. $ 10]
(a) Boilers of 15 horsepower
or less................................................. $ 65
(b) Boilers greater than 15
horsepower to
100 horsepower....... $ 85
(c) Boilers greater than 100
horsepower to
500 horsepower....... $ 100
(d) Boilers greater
than 500
horsepower....................... $ 110
(e) Cast iron boilers............................... $ 65
(f) Pressure vessels having
a product
volume of
20 cubic feet
or less.......................... $ 55
(g) Pressure vessels having
a product
volume
greater than
20 cubic feet................ $ 75
(4) A reinspection fee shall be charged at the maximum rate
of $60 per hour for travel and inspection time to defray the cost of a
reinspection when deviations from the minimum safety standards are found during
any inspection.
Approved by the Governor May
21, 2001
Filed in the office of
Secretary of State May 21, 2001
Effective date January 1,
2002
__________