71st OREGON LEGISLATIVE ASSEMBLY--2001 Regular Session
SA to SB 5516
LC 9516/SB 5516-1
SENATE AMENDMENTS TO
SENATE BILL 5516
By JOINT COMMITTEE ON WAYS AND MEANS
May 24
On page 1 of the printed bill, delete lines 5 through 30 and
delete pages 2 through 5 and insert:
' { + SECTION 1. + } { + For the purpose of carrying out the
provisions of ORS 291.055 (1), the following new fee, approved by
the Oregon Department of Administrative Services, for the
Department of Environmental Quality is approved as follows: + }
____NOTE_TO_GOPHER_CUSTOMERS:__________________________________
THE FOLLOWING TABULAR TEXT MAY BE IRREGULAR.
FOR COMPLETE INFORMATION PLEASE SEE THE PRINTED MEASURE.
_______________________________________________________________
{ +
Water Quality Division:
The owner of a holding
tank regulated under WPCF
permit submitting an
annual written
certification, on a
department approved
form, that the holding
tank has been operated
the previous year in
full compliance with the
permit and that the
previous year service
log for the holding
tank is available
for inspection by
the department... $ 25 + }
____________________________________________________________
END OF POSSIBLE IRREGULAR TABULAR TEXT
____________________________________________________________
' { + SECTION 2. + } { + For the purpose of carrying out the
provisions of ORS 291.055 (1), the following fee increases,
approved by the Oregon Department of Administrative Services, for
the Department of Environmental Quality are approved as
follows: + }
____NOTE_TO_GOPHER_CUSTOMERS:__________________________________
THE FOLLOWING TABULAR TEXT MAY BE IRREGULAR.
FOR COMPLETE INFORMATION PLEASE SEE THE PRINTED MEASURE.
_______________________________________________________________
{ +
(1Air Quality Division:
(a) Title V operating permit
(A) Annual base fee.. $ 2,884
(B) Emission fee....33.63 per ton
(C) Existing source permit
revision, administ$ation 288
(D) Existing source permit
revision, simple. $ 1,154
(E) Existing source permit
revision, moderate$ 8,651
(F) Existing source permit
revision, complex $ 17,303
(G) Ambient air monitoring
review........... $ 2,307
(b) Air contaminant
discharge permit. Air containment + }
____NOTE_TO_GOPHER_CUSTOMERS:__________________________________
THE FOLLOWING TABULAR TEXT MAY BE IRREGULAR.
FOR COMPLETE INFORMATION PLEASE SEE THE PRINTED MEASURE.
_______________________________________________________________
{ +
sources and
associated fee
schedule table 2
- OAR 340-216-0020 + }
____NOTE_TO_GOPHER_CUSTOMERS:__________________________________
THE FOLLOWING TABULAR TEXT MAY BE IRREGULAR.
FOR COMPLETE INFORMATION PLEASE SEE THE PRINTED MEASURE.
_______________________________________________________________
{ +
(AElective permits -
synthetic minor sources,
permit application or
modification..... $ 2,192
(B) Elective permits -
synthetic minor sources,
annual compliance
assurance........ $ 1,154
(2) Water Quality Division:
On-site
(a) New site evaluation:
Single family dwelling:
(A) First lot........ $ 425
(B) Each additional lot
evaluated during initial
visit............ $ 425
(b) Commercial facility system:
(A) For first 1,000 gallons
projected daily
sewage flow...... $ 425
(B)(For systems with projected
sewage flows greater than
1,000 but not more than
2,500 gallons, the site
evaluation fee is $ 425
(ii)Plus each additional 500
gallons or part thereof
above 1,000 gallon$ 110
(C) Site evaluation report
review........... $ 400
(c) Construction-installation
permit:
First 1,000 gallons
projected daily
sewage flow:
(A) Standard on-site s$stem 630
(B) Alternative system:
Aerobic system... $ 630
(C) Alternative system:
Capping fill..... $ 950
(D) Alternative system:
Cesspool......... $ 630
(E) Alternative system:
Disposal trenches
in Saprolite..... $ 630
(F) Alternative system:
Evapotranspiration -
absorption....... $ 630
(G) Alternative system:
Gray water waste
disposal sump.... $ 280
(H) Alternative system:
Pressure distribut$on 950
(I) Alternative system:
Redundant system. $ 630
(J) Alternative system:
Sand filter...... $ 950
(K) Alternative system:
Seepage pit...... $ 630
(L) Alternative system:
Seepage trench... $ 630
(M) Alternative system:
Steep Slope...... $ 630
(N) Alternative system:
Tile dewatering.. $ 950
(O) Reinspection fee. $ 235
(P) With the exceptions of
sand filter and pressure
distribution systems, a
fee may be added to all
permits that specify the
use of a pump or a
dosing siphon.... $ 40
(Q) Projected daily sewage
flows greater than
1,000 gallons,
the construction -
installation permit fee
shall be equal to the
fee required in
subparagraphs (A) to (N)
of this paragraph plus
for each additional 500
gallons or part thereof
above 1,000 gallon$ 60
(d) Commercial facility
system, plan review:
(A) For a system with a
projected daily sewage
flow of 600 gallons,
but not more than 1,000
gallons projected daily
sewage flow...... $ 230
(B)(For a system with a
projected sewage flow
greater than 1,000
gallons, the plan
review fee shall b$ 250
(ii)Plus for each additional
500 gallons or part
thereof above 1,000
gallons, to a maximum
sewage flow limit of
2,500 gallons per $ay 40
(e) Permit transfer,
reinstatement or renewal:
(A) If field visit req$ired 325
(B) No field visit req$ired 95
(f) Alteration permit:
(A) Major............ $ 345
(B) Minor............ $ 165
(g) Repair permit:
(A) Single family dwelling -
Major............ $ 345
(B) Single family dwelling -
Minor............ $ 165
(C) Commercial facility:
Minor............ $ 290
(h) Permit denial revi$w 220
(i) Authorization notice:
(A) If field visit req$ired 390
(B) No field visit req$ired 100
(C) Authorization notice
denial review.... $ 400
(j) Annual evaluation of
alternate system (where
required)........ $ 330
(k) Evaluation of temporary
or hardship mobile$home 330
(L) Variance to on-site
system rules..... $ 1,300
(m) Rural area consideration
pursuant to OAR 340-071
-0410:
Site evaluation.. $ 450
(n) Sewage disposal service:
(A) New business licen$e 425
(B) Renewal of existing and
valid business lic$nse 320
(C) Transfer of or amendments
to license....... $ 200
(D) Reinstatement of
suspended license $ 250
(E) Pumper truck inspection,
first vehicle, each
inspection....... $ 100
(F) Pumper truck inspection,
each additional vehicle,
each inspection.. $ 50
(o) Experimental system
permit........... $ 5,850
(p) Existing system evaluation
report........... $ 400
(q) Innovative or alternative
technology or material
review........... $ 1,000
(r) Material plan revi$w 300
(s) Site evaluation su$char40 + }
____________________________________________________________
END OF POSSIBLE IRREGULAR TABULAR TEXT
____________________________________________________________
' { + SECTION 3. + } { + This 2001 Act being necessary for
the immediate preservation of the public peace, health and
safety, an emergency is declared to exist, and this 2001 Act
takes effect July 1, 2001. + } ' .
----------