75th OREGON LEGISLATIVE ASSEMBLY--2009 Regular Session
NOTE: Matter within { + braces and plus signs + } in an
amended section is new. Matter within { - braces and minus
signs - } is existing law to be omitted. New sections are within
{ + braces and plus signs + } .
LC 3232
House Bill 3038
Sponsored by COMMITTEE ON SUSTAINABILITY AND ECONOMIC DEVELOPMENT
SUMMARY
The following summary is not prepared by the sponsors of the
measure and is not a part of the body thereof subject to
consideration by the Legislative Assembly. It is an editor's
brief statement of the essential features of the measure as
introduced.
Requires Public Utility Commission to study electricity needs
in Oregon.
Sunsets January 2, 2012.
A BILL FOR AN ACT
Relating to electricity.
Be It Enacted by the People of the State of Oregon:
SECTION 1. { + The Public Utility Commission shall undertake a
study of electricity needs in Oregon in order to identify
opportunities for the development of electricity from renewable
energy sources. The commission shall report the results of the
study to the Seventy-sixth Legislative Assembly. + }
SECTION 2. { + Section 1 of this 2009 Act is repealed on
January 2, 2012. + }
----------