Be It Enacted by the People of the State of Oregon:
SECTION 1. ORS 279C.815 is amended to
read:
279C.815. (1) As used in this section,
“person” [includes any] means an
employer, a labor organization or [any]
an official representative of an employee or employer association.
(2)(a) The Commissioner of the Bureau
of Labor and Industries at least once each year shall determine the
prevailing rate of wage for workers in each trade or occupation in each
locality described in ORS 279C.800 [at
least once each year] by means of an independent wage survey and shall
make this information available at least twice each year. The commissioner may
amend the rate at any time.
(b) If [it appears to the commissioner that] the data derived only from the
survey described in paragraph (a) of this subsection [are] appear to the commissioner to be insufficient to
determine the prevailing rate of wage, the commissioner [also] shall consider additional information such as collective
bargaining agreements, other independent wage surveys and the prevailing rates
of wage determined by appropriate federal agencies or agencies of adjoining
states. If there is not a majority in the same trade or occupation paid at the
same rate, the average rate of hourly wage, including all fringe benefits, paid
in the locality to workers in the same trade or occupation [shall be] is the prevailing rate.
If the wage [paid by any] a
contractor or subcontractor pays to workers on [any] a public works is based on [some] a period of time other than an hour, the hourly wage [shall] must be mathematically
determined by the number of hours worked in that period of time.
[(c)
The commissioner shall compare the prevailing rate of wage determined under
paragraph (a) of this subsection with the federal prevailing rate of wage
required under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) and determine which
rate is higher for workers in each trade or occupation in each locality. The
commissioner shall make this information, showing which prevailing rate of wage
is higher for workers in each trade or occupation in each locality, available
at the same time as the commissioner makes information available under
paragraph (a) of this subsection.]
(3) A person shall make [such] reports and returns to the Bureau
of Labor and Industries [as] that
the commissioner [may require]
requires to determine the prevailing rates of wage[. The reports and returns shall be made upon forms furnished by],
using forms the bureau provides and within the time [prescribed by] the commissioner
prescribes. The person or an authorized representative of the person shall
certify to the accuracy of the reports and returns.
(4) Notwithstanding ORS 192.410 to
192.505, [all] reports and returns or
other information provided to the commissioner under this section are
confidential and not available for inspection by the public.
(5) [In order to assist the commissioner in making determinations of the
prevailing rates of wage,] The commissioner may enter into [contracts] a contract with a
public or private [parties] party
to obtain [relevant] data and
information the commissioner needs to determine the prevailing rate of wage.
[Any such] The contract may [include provisions] provide for
the manner and extent of the market review of affected trades and occupations
and [such] for other requirements
regarding timelines of reports, accuracy of data and information and
supervision and review as the commissioner [may
prescribe] prescribes.
SECTION 2. ORS 279C.830 is amended to
read:
279C.830. (1)(a) Except as provided in
paragraph [(d)] (e) of this
subsection, the specifications for every contract for public works [shall] must contain a provision [stating] that states the existing
state prevailing rate of wage and, if applicable, the federal prevailing rate
of wage required under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) that [may] must be paid to workers in
each trade or occupation [required for
the public works employed in the performance of the contract either by]
that the contractor or subcontractor or other person who is a party to
the contract uses in performing all or part of the contract. [doing or contracting to do the whole or any
part of the work contemplated by the contract. When] If the
prevailing rates of wage are available electronically or are accessible on the
Internet, the rates may be incorporated into the specifications by referring to
the electronically accessible or Internet-accessible rates and by providing
adequate information about how to access the rates.
(b) If a public agency [is required] under paragraph (a) of this
subsection [to] must include
the state and federal prevailing rates of wage in the specifications, the
public agency [also shall include in the
specifications information showing which prevailing rate of wage is higher for
workers in each trade or occupation in each locality, as determined by the
Commissioner of the Bureau of Labor and Industries under ORS 279C.815 (2)(c).]
shall also require the contractor to pay the higher of the applicable state
or federal prevailing rate of wage to all workers on the public works.
(c) Every contract and subcontract [shall contain a provision] must
provide that the workers [shall]
must be paid not less than the specified minimum hourly rate of wage in
accordance with ORS 279C.838 and 279C.840.
(d) If a public works project is
subject both to ORS 279C.800 to 279C.870 and to the Davis-Bacon Act, every
contract and subcontract must provide that workers on the public works must be
paid not less than the higher of the applicable state or federal prevailing
rate of wage.
[(d)]
(e) A public works project described in ORS 279C.800 (6)(a)(B) or (C) is
subject to the existing state prevailing rate of wage or, if applicable, the
federal prevailing rate of wage required under the Davis-Bacon Act that is in
effect at the time a public agency enters into an agreement with a private
entity for the project. After that time, the specifications for [any] a contract for the public
works [shall] must include the
applicable prevailing rate of wage.
(2) The specifications for [every] a contract for public
works [shall contain a provision stating]
must provide that the contractor and every subcontractor must have a public
works bond filed with the Construction Contractors Board before starting work
on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9). Every
contract [awarded by] that a
contracting agency awards must require [shall contain a provision requiring] the contractor to:
(a) [To] Have a public works bond filed with the Construction
Contractors Board before starting work on the project, unless exempt under ORS
279C.836 (4), (7), (8) or (9).
(b) [To include in] Require, in every subcontract, [a provision requiring the subcontractor to]
that the subcontractor have a public works bond filed with the Construction
Contractors Board before starting work on the project, unless exempt under ORS
279C.836 (4), (7), (8) or (9).
SECTION 3. ORS 279C.855 is amended to
read:
279C.855. (1) [Any] A contractor or subcontractor or contractor’s or
subcontractor’s surety that violates the provisions of ORS 279C.840 is liable
to the workers affected in the amount of [their]
the workers’ unpaid minimum wages, including all fringe benefits, and in an
additional amount equal to the unpaid wages as liquidated damages.
(2) Actions to enforce liability to
workers under subsection (1) of this section may be brought as actions on
contractors’ bonds as provided for in ORS 279C.610.
(3) If a public agency fails to [include a provision that the contractor and
any subcontractor shall comply with ORS 279C.840] provide in the
advertisement for bids, the request for bids, the contract specifications, the
accepted bid or elsewhere in the contract documents that the contractor and
any subcontractor must comply with ORS 279C.840, the liability of the
public agency for unpaid minimum wages, as described in subsection (1) of this
section, is joint and several with [any]
a contractor or subcontractor that had notice of the requirement to comply
with ORS 279C.840.
(4) [When] If a public works project is subject to the
Davis-Bacon Act, [(] 40 U.S.C.
3141 et seq.[)], and a public
agency fails to include the state and federal prevailing rates of wage in the
specifications for the contract for public works as required under ORS 279C.830
(1)(a), or fails to [include in the
specifications information showing which prevailing rate of wage is higher for
workers in each trade or occupation in each locality as required under ORS
279C.830 (1)(b)] provide in the contract that workers on the public
works must be paid not less than the higher of the applicable state or federal
prevailing rate of wage as required under ORS 279C.830 (1)(d), the public
agency is liable to each affected worker for:
(a) The worker’s unpaid minimum wages,
including fringe benefits, in an amount that equals, for each hour worked, the
difference between the applicable higher rate of wage and the lower rate of
wage; and
(b) An additional amount, equal to the
amount of unpaid minimum wages due under paragraph (a) of this subsection, as
liquidated damages.
(5) The Commissioner of the Bureau of
Labor and Industries may enforce the provisions of subsections (3) and (4) of
this section by a civil action under ORS 279C.850 (4), by a civil action on an
assigned wage claim under ORS 652.330, or by an administrative proceeding on an
assigned wage claim under ORS 652.332.
SECTION 4. The amendments to ORS
279C.830 and 279C.855 by sections 2 and 3 of this 2011 Act apply to contracts
for public works that a contracting agency first advertises or solicits on or
after the effective date of this 2011 Act or, if the contracting agency does
not advertise or solicit the contract, to a contract that the contracting
agency enters into on or after the effective date of this 2011 Act.
SECTION 5. This 2011 Act being
necessary for the immediate preservation of the public peace, health and
safety, an emergency is declared to exist, and this 2011 Act takes effect on
its passage.
Approved by
the Governor June 7, 2011
Filed in the
office of Secretary of State June 7, 2011
Effective date
June 7, 2011